Established in 1898 in Omegna as ”Ditta Cesare Oddicini”, at the beginning the main activities were the production of forniture and the wood and timber trade, followed in the ’20 by the production of wooden floors. The introduction in the production of the ”accordion” folding doors went back at the ’60, followed by modular raised floors in 1968, and then, for the first time in Italy, by the production of operable partitions for a functional and dynamic division of areas and spaces.
More and more specialized in the production of operable and moveable partitions, the firm was changed in a joint stock company in 1984, Oddicini Industrie S.p.A., that in 1988 moved to Gravellona Toce, close to the A26 Milano - Laghi highway. The industrial plants now cover a total surface of 12.000 sqm, which 7.000 are covered.Oddicini Industrie S.p.A. operates with an ISO EN 9001 and ISO EN 14001 certified quality system and produces the following kind of products:

DOMINO operable partition
DOMINO DUO operable partition
ELEVFLOOR raised access floor
EXTESA operable partition
MAXPARETE E-Motion operable partition
MAXPARETE HSP operable partition
MAXPARETE HSP MATIC operable partition
MAXPARETE HSP PYRO operable partition
MAXPARETE HSP PYRO MNP operable partitionl
OdAcustic acoustic panels

Chia 1 Chia 2 Continuum 1 Continuum 2 Dino 19 Dino 23 Infanzia 1 Infanzia 2 Nave 2 Nave 3

Oddicini Industrie S.p.A. is present all over the national market with a detailed agents net and over the international market. For the foreign trade Oddicini Industrie S.p.A. co-operates with exclusive distributors and, for big and relevant projects, directly in association company. Thanks to the pluriannual experience and matured competences, Oddicini Industrie S.p.A. is able to satisfy every kind of request for any place: public congress rooms, work spaces, residential spaces and so on.Oddicini Industrie S.p.A. operable partitions are realized with high quality materials and with precious finishes and can be used in different situations with always high quality results.


19/12/2012
Christmas 2011
Sending you our warmest Season's Greetings we infor[...]  >read more
Christmas 2011

Sending you our warmest Season's Greetings we inform you that our offices will be closed from 24/12/2012 till 06/01/2013 included.



27/03/2012
New Central Bank of Kuwait headquarters
The design competition initially started in 2003 and at[...]  >read more
New Central Bank of Kuwait headquarters

The design competition initially started in 2003 and attracted more than 15 of the world's leading international design and consulting companies. The 240m-tall 41-storey triangular-shaped tower topped with a glass pyramid is scheduled to be completed in 2013. When finished, it is expected to dominate the city's skyline, a city already renowned for its sophisticated architectural designs.

The project is being completed in three phases:

- the first package (2004/2009) has been completed and included excavation, new electrical substation construction, shoring, dewatering and site offices construction, including accommodation and compounds for the 1,600 workers.

- the second phase (2009/2012) included core walls of 37 floors of the main tower, plumbing, firefighting and electrical works

- the third phase (2012/completion of works) is involving design, furnishings, audiovisual requirements and signage of the VIP floors; more, about 30.000 sqm of ELEVFLOOR raised floor will enrich the entry and the technical and office areas.

31/01/2012
Oddicini at BH4 Hotel in Milan
BH4 Hotel, in Milan's new DefenseThe new BH4 Hotel [...]  >read more
Oddicini at BH4 Hotel in Milan

BH4 Hotel, in Milan's new Defense

The new BH4 Hotel (Boscolo Group) is going to be inaugurated in the northern outskirts of Milan. The building (a 91 meters high tower that, in 2009, has earned its designer the "Golden Brick" Real Estate Award as "the best hotel and tourism project") has, among other facilities, a conference center that includes 6 meeting rooms that can accommodate from 30 to 150 people each. The flexibility of meeting rooms is guaranteed by two Maxparete HSP MATIC operable partitions, with lilac colored fireproof fabric finishings and a 49 dB soundproofing level.

15/12/2011
Christmas 2011
Sending you our warmest Season's Greetings we infor[...]  >read more
Christmas 2011

Sending you our warmest Season's Greetings we inform you that our offices will be closed from 24/12/2011 till 08/01/2012 included.

Kind regards.